Within the scope of the project designed by considering earthquake analyses in the permanent condition; to ensure deep excavation safety and the stability of surrounding structures, the Application of a total of 262 bored piles (totaling 3932 m) with a diameter of 80 cm and 8344 m of permanent soil nail applications were carried out. This system, designed according to excavation depth and surrounding loads, was inspected via pile integrity tests (PIT) and soil nail pull-out tests applied during the manufacturing process; as a result of the analyses performed, it was technically evaluated that the system meets the necessary strength, rigidity, and safety conditions.
Services given:
Applications: