Support was provided as a solution partner to the Employer firm in the Ekol Tulip Logistics Site works located in Kocaeli Gebze. Throughout the project, the Application of cantilever and horizontally supported bored piles with diameters of Ø80, Ø100, and Ø120 cm, optimized according to soil parameters and load conditions, was completed; to limit the horizontal displacements of the system, permanent prestressed anchor applications with 3, 4, 5, and 6 strands were carried out.
To ensure deep excavation safety, rigidity was increased with steel pipe struts in critical regions, and excavation surfaces were covered with shotcrete, ensuring slope stability and site safety in accordance with technical specifications.