Regional ground improvement works were carried out at the San33 Geothermal Power Plant site to increase the soil bearing capacity and minimize potential settlement risks. In this context, the engineering properties of the soil were improved by constructing a total of 336 Jet Grout columns with a diameter of 60 cm. Additionally, Packer Injection applications were carried out on the site to control the permeability in the soil profile.
Services given:
Applications: